Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

RHKW waste burning plant, Linz-Mitte, Austria

  • Building Type:
  • Energy Construction
Fullscreen map Close

The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.

Project facts

Developer:
LINZ AG
Construction Company:
Bilfinger Berger BauGmbH, Linz
Structural Designer:
BHM Ingenieure, Linz
Precaster:
HABAU Hoch- und Tiefbau, Perg
Delivery year:
2010
Completion year:
2011

More info

Contacts

Ing. Günther Pock, Sales Manager Mobile +43 664 381 74 05
Back to reference search

Results for

Reset filters

Building Type

Peikko Solutions

Peikko Products

Projects Featuring